Roshan Housing Scheme, also known as Roshan Colony, is a private housing scheme near Haji Abad Chowk, Diyal Road, in Tehsil and District Dera Ismail Khan. It was sanctioned by the Tehsil Municipal Administration, D.I. Khan under Approval No. 1716/TMA/DIK dated 30 September 2024.
The scheme covers 30 kanal with 99 residential plots, one commercial plot, one mosque plot and one solid-waste site. The stated aim of the project is to provide safe, economical and environment-friendly housing with modern facilities for people of the area. The estimated population at full occupation is 594 persons.
Scheme office
Phone: 0336-7683991
Key facts
| Approval | 1716/TMA/DIK |
| Approval date | 30 September 2024 |
| Approving authority | TMA Dera Ismail Khan |
| Revenue estate | Mouza Ratta Kulachi, Hadbast No. 76 |
| Total area | 30 kanal (15,376.28 m²) |
| Residential plots | 99, mostly 5 marla |
| Other plots | 1 commercial, 1 mosque |
| Scheme type | Private — housing plots |
Land use
Areas as stated in the General Environmental Assessment submitted to EPA (March 2024). Final figures are those on the approved layout plan.
| Use | Area (m²) | Notes |
|---|---|---|
| Residential plots | 10,845.02 | 99 plots |
| Paved roads and streets | 4,194.13 | Transferred to TMA D.I. Khan (see Land & title) |
| Mosque | 127.53 | 1 plot |
| Solid-waste site | 126.35 | Transferred to TMA D.I. Khan |
| Commercial (shops) | 92.63 | 1 plot |
| Total area of scheme (as stated) | 15,376.28 | 30 kanal |
Infrastructure & services
As described in the scheme's approval documents. Progress on each item is reported on the Development page.
Roads & streets
Concrete-paved streets to LG&RD / TMA standards, with a 30 ft wide access road. The scheme sits beside Diyal Road, whose right of way is 39 ft wall to wall (C&W NOC No. 1014).
Sewerage
A piped sewerage system with 75 mm HDPE house connections, 150 mm street sewers and a 450 mm secondary sewer connecting to the existing 900 mm trunk sewer on Diyal Road. The design was provided to TMA. The EPA approval also sets conditions on sewage treatment — see Environment.
Electricity & street lights
Under condition (i) of the TMA approval, the main power supply and street lights are to be maintained by the owners of the scheme.
Water supply
The GEA report states there is no centralised water supply and plot owners install their own wells, as is common in D.I. Khan. The EPA decision describes individual bore holes and a tube well with an overhead water tank. Any common water facility will be announced on the Development page.
Solid waste
Waste is to be collected in bins and containers at the scheme's solid-waste site and transferred to the TMA's designated disposal site.
Natural gas
Gas connections were not being provided by SNGPL at the time of the environmental assessment (March 2024).